Installation Of Operating Handle Bg39; Test - Dynapac BG39 Power Float Manual De Instrucciones

Ocultar thumbs Ver también para BG39 Power Float:
Tabla de contenido

INSTALLATION OF OPERATING HANDLE BG39

Take off the 4 x nuts and washers from the base . Then put in place the operating handle and secure it
-
with washers and nuts ( 17mm Flat spanner).
Connect the yellow / green cable to one of the screws of the operating handle.
-
-
Connect the red wire of the operating handle to the red wire of the base.
Hook up the throttle cable for each particular engine (Cruciform screw driver) . When throttle control is
-
fully pushed in, engine throttle control should be against idle adjustment stop . If adjustment in cable
length is necessary, make adjustment at handle end of the cable (3mm Screw driver).
-
Turn trowel control knob in a counter-clockwise direction until rotation is impossible. Take off the pin from
the fork, slide the cable into the fork and then secure it with the pin.

TEST

ALWAYS HAVE THE THROTTLE AT IDLE WHEN STARTING ENGINE
-
Check engine oil level.
Fill gasoline tank.
-
Set safety switch on "ON" position (on engine and operating handle).
-
Start the engine (see engine operating manual) and set the engine speed to 3000 rpm . If necessary
-
adjust throttle cable for proper operation.
WORKSHOP TOOLS
File: 4700369016_ENG_NO.doc
INSTRUCTION MANUAL – BVG39
- Connect the ground cable 18 to the cover holder using
washer (13) and screw (14).
CAUTION
Page 8 / 24
Tabla de contenido
loading

Tabla de contenido