Checking The Installation - Airzone Easyzone ZS6 Guía Rápida

Ocultar thumbs Ver también para Easyzone ZS6:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Checking the Installation

Check the following items:
EN
1.
Status of the main control board LEDs and of the other control elements connected.
Consult the Self-diagnostics section on each element's technical fact sheet.
2.
The main control board LEDs indicating the opening of motorized elements light up in
sequence.
3.
Power supply to wired and wireless thermostats.
10
AZ1
AZ2
D4
D5
D11
D6
D7
N
L
P3
AZ3
SW1
D3
D2
D1
A
D37 D39 D41 D43 D45 D47
D36 D38 D40 D42 D44 D46
M1
M4
M2
M3
M5
M6
Blinking
Steady
D10 D18
Switches
D19
A (M1 ... M6)
A (M1 ... M6)
D9
D8
(Green) Damper
opening
(Red) Damper
closing
Tabla de contenido
loading

Este manual también es adecuado para:

Easyzone s62

Tabla de contenido