|
|
The present certificate was made on "___"_____________201__
|
| by the owner of refrigerated table _______________________________________________
___________________________________________________________________________
| and representative of the service center
| __________________________________________________________________________
| __________________________________________________________________________
|
| to certify that the refrigerated table type ___________ factory number _________________
| with compressor ____________________________________________________________ ,
| manufactured on "___"_______201___,
| was put into operation on "___"_______201___ by electrical mechanical engineer
| __________________________________________________________________________
| __________________________________________________________________________
| certificate certifying the right for installation and maintenance of the trade refrigerating
equipment No. ____ issued on "___" __________.
| __________________________________________________________________________
|
The table was accepted for servicing by mechanical engineer
| __________________________________________________________________________
| __________________________________________________________________________
| certificate certifying the right for installation and maintenance of the trade refrigerating
equipment No. ____ issued on "___" __________.
|
| ______________________________________________________________
|
|
|
|
Owner
|
|
Center representative
|
2
Attachment A.
(sample)
CERTIFICATE OF COMMISSIONING
(company name and address,
title and full name)
(name)
(title, full name)
(company name,
full name)
(company name)
(company name,
full name)
(company name)
(signature) Name
(signature) Name