Wilo TR/E 216 Serie Instrucciones De Instalación Y Funcionamiento página 21

Tabla de contenido
6.4.2
Installation with lowering device
1
8
7
6
5
Fig. 3: Prepare the mixer
Installation and operating instructions Wilo-EMU TR/TRE 216 ... 326-3
Installation and electrical connection
The mixer is lowered into the basin using a lowering device. The lowering device's guide pipe
leads the mixer safely to the operating point. The resultant reaction forces are transferred
via the lowering device directly into the foundation. The foundation must be dimensioned
to bear this load!
CAUTION! Material damage due to incorrect accessories! Due to the high reaction forces,
the mixer may only be operated with the manufacturer's accessories (lowering device
and frame). If the mixer is ordered for installation with a lowering device, the frame
comes pre-assembled. If the mixer is delivered without a frame, order the appropriate
frame from customer service!
Preparatory tasks
1
Hoist
2
Lifting equipment
3
Shackle for attachment
4
Propeller
5
Pedestal for secure set-down
2
6
Support block for aligning
3
7
Frame
8
Cable brackets for strain relief
Mixer set down and positioned horizontal.
4
Frame mounted on the mixer.
Lowering device mounted in basin.
Hoisting gear with sufficient bearing capacity is available.
1. Attach lifting equipment to frame with a shackle.
2. Mount propeller. See separate installation instructions on installing the blades.
3. Version with plastic rollers: Loosen linchpins and dismantle plastic rollers and quick-re-
lease axles.
NOTICE! Prepare components for further installation.
4. Lay all connection cables.
5. Mount the cable bracket for the cable anchoring on the edge of the basin.
CAUTION! In case of powerful flows in the basin, install the "additional rope anchor-
ing"!
en-US
21

Capítulos

Tabla de contenido
loading

Tabla de contenido