Schedule C Maintenance; Return To Service - Generac RD015 Manual Del Propietário

Ocultar thumbs Ver también para RD015:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 61
5.9 — Schedule C Maintenance
NOTE: Perform Schedule C maintenance after 1000 hours of service. Before proceeding below, first perform all
tasks listed under Schedule A Maintenance and Schedule B Maintenance.
*
The following procedures require special tools and skills. Contact a Generac Dealer or an authorized
service provider to perform these tasks.
Inspect Fuel Tank
Check/Adjust Fuel Injection Valve Pressure
Check/Adjust Fuel Injection Pump Timing
Adjust Intake/Exhaust Valve Clearance
Tighten Critical Fasteners
NOTE: Reset the A-B-C/Year time maintenance schedule counter using the Dealer Sub Menu (password
required).
5.10 — Return To Service
After inspection, maintenance or service of the generator, return the unit to service following the steps below.
Pull up rubber flap covering fuse holder and install 7.5 amp fuse. See A of Figure 5-20.
1.
Install T1 fuse in transfer switch.
2.
Press AUTO on the control pad. A green LED illuminates to confirm that the system is in the AUTO mode. See B
3.
of Figure 5-20.
Move the Main Circuit Breaker switch up to the ON (Closed) position. See C of Figure 5-20.
4.
Close the viewing window.
5.
Remove the DO NOT OPERATE tag or placard from both the control panel and transfer switch.
6.
Reset the time and date.
7.
Owner's Manual for Stationary Diesel Generators
7.5 Amp Fuse Holder
C
LCD Screen
o
OFF
PUSH TO TRIP
Main Circuit Breaker
Control Pad
Figure 5-20. Generator Control Panel
Maintenance
A
B
43
Tabla de contenido
loading

Este manual también es adecuado para:

Rd020Rd030Rd048Rd0500066781

Tabla de contenido