Application; Technical Specifications; Scope Of Delivery; Dimensions - Franke AQFU0006 Instrucciones De Montaje

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
5.

Application

Ready-to-connect stainless steel fitting unit for wall mounting, for connection to hot and
cold water from left rear position using connection pipes.
With pre-assembled fitting connection units and hygiene set (6 V DC) for flushing the
pipes via the last tapping point.
Integrated control function:
– Hygiene flush (3 minutes), fixed interval - every 24 hours
Adjustable functional parameters via optional remote control:
– Fixed interval (8, 24, 48 or 72 hours) and flushing time (10 second - 10 minutes)
for automatic cold- and hot-water hygiene flush
6.

Technical specifications

Power supply:
Protection class:
7.

Scope of delivery

8.

Dimensions

9.

Installation example

10. Assembly

Important!
Prior to the assembly process, flush the pipework in accordance with DIN 1988.
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
Depending on the composition of the wall, special wall plugs may have to be used
(to be provided by the customer).
10.1 The drill-holes for the suspension strip should be marked according to the dimen-
sions.
10.2 Drill holes in accordance with these markings.
10.3 Insert the wall plugs.
10.4 Screw on the suspension rail.
10.5 Place the upper pipe onto the suspension strip brackets.
10.6 Install the water supply at the designated points.
6 V lithium battery CRP2
IP 65
5
Tabla de contenido
loading

Este manual también es adecuado para:

Aqfu0012Aqfu0018Aqfu0024Aqfu0030

Tabla de contenido