as to be able to fill it quickly too during the loading operation. In this case the
quantity of water necessary for the loading operation will depend on the length
of the suction pipe (0,7 litres + ...).
Installation "below head": if there are no check valves between the water de-
posit and the system (or if they are open), it loads automatically as soon as it is
allowed to let out the trapped air. So slackening the filling cap (Face F - Fig.1)
enough to vent the air allows the system to load completely. You must survey
the operation and close the loading door as soon as the water comes out (how-
ever it is recommended to fit a check valve in the section of the suction pipe
and to use it to control the loading operation with the cap loose). Alternatively,
in the case where the suction pipe is intercepted by a closed valve, the loading
operation may be carried out in a similar way to the one described for installa-
tion over head.
3 - COMMISSIONING
The suction depth must not exceed 8 m.
3.1 - Electrical Connections
To improve immunity to the possible noise radiated towards other appli-
ances it is recommended to use a separate electrical duct to supply the
product.
The line voltage may change when the electropump is started.
The line voltage may undergo variations depending on other de-
vices connected to it and on the quality of the line.
It is recommended to carry out installation as indicated in the
manual, in compliance with the laws, directives and standards in
force in the place of use and depending on the application. The
product contains an inverter inside which there are continuous
voltages and currents with high-frequency components (see ta-
ble 0).
49
Type of possible fault currents to earth
Alternating
Inverter with
single-phase
X
power supply
Figure 11 - bis Installation example
The thermal magnetic circuit breaker must be correctly sized (see Electri-
cal Characteristics).
With high-
Unipolar
Direct
frequency
pulsed
components
X
Table 0
X