Bego 335.00879 Serie Traducción Del Manual Original página 33

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 76
Refilling the BEGO full demineralisation cartridge
Discharging boiler
English ⋅ Triton SLA
You can also fill the inserts with Durox yourself if you
want to:
Durox non-reusable ion-exchanger resin, 6 l 52121
1.
Pull rivets (1) out.
2.
Remove bottom section (2).
NOTE
Dispose of spent resin in the same way as
synthetic resin.
3.
Wash insert thoroughly under running water.
4.
Pour in about 2.3 l of Durox replacement resin
and compact by placing on a vibrator. Fill in
Durox up to about 5 mm below the rivet-holes.
ATTENTION
Property damage!
There are different bottoms (see
figure). To avoid damage when
installing the inserts, do not inter-
change the bottoms!
5.
Replace bottom section with rivets.
6.
Fit seal ring (see "Replacing the BEGO full
demineralisation cartridge insert", page 30)
and store insert so that it is protected from dust
until used.
The emptying of the water out of the kettle can
become necessary for the transport of the unit or for
any other purposes.
1.
Set switch (1) to 0.
2.
Press relief (2) and unscrew cover (3).
Place hose (4) in water basing and open cock valve
(5) with key (6).
en
31
Tabla de contenido
loading

Este manual también es adecuado para:

Triton sla

Tabla de contenido