General Instructions - T&S B-2250 Instrucciones De Instalación Y Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

General Instructions

Installation:
See separate instructions for installing
no.7 into deck.
1. Shut off water supply and drain
lines. Apply teflon tape or pipe joint
compound to threads on both ends of
no.5. Screw no.5 into no.7 and hand
tighten.
2. Slide no.6 down no.5 (about
halfway) and tighten temporarily.
6
5
3. Screw no.4 down on no.5 and hand
tighten, then tighten no.4 with a wrench,
which will also tighten no.5. Make sure
to align no.3 with no.2 over center of sink,
directly in front of no.5 while tightening.
Note: If new no.3 is being installed on
no.2, make sure it's installed in the
upright position.
4
4. Adjust position of no.6 so that no.1
hangs loosely in it without straining
no.2 or no.3.
7
5. Turn on water supply and check for
leaks.
See back pages for similar unit installa-
tions.
Caution: Turn off water supply
at base faucet when not in use.
7
4
3
2
1
Tabla de contenido
loading

Tabla de contenido