General Instructions - T&S B-0180 Instrucciones De Instalación Y Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

General Instructions

Installation: Stanchion Unit
Use numbers on stanchion unit
assembly.
1. Shut off water supply and drain
lines. Prepare the 1/2" pipe nipple
extending 6" [15cm] above the floor,
roughed into concrete. Apply teflon
tape or pipe joint compound to
threads.
2. Screw no.5 onto floor nipple. Be
sure to install with arrows pointing
up. Apply teflon tape or pipe joint
compound to threaded ends.
flange
cap
3. Unscrew flange caps from bottom
end of no.8. Apply teflon tape or
pipe joint compound to threads of
no.8.
4. Screw no.8 into no.5 with running
threads up.
5. Remove no.9 from top of no.8.
6. Slide no.1 and no.2 cover over
piping and put no.6 (or no.7) in
place to make certain no.8 is
centered through hole in no.6.
6"[15cm]
floor
nipple
7. Mark floor for no.1 drilling
locations while no.1, no.2 and no.6
are
assembled.
9
8. Remove no.1, no.2 and no.6 and
8
drill (3) three 7/8"[2 cm] Ø holes into
floor, 2-1/2"[6 cm] deep. Insert no.3
into holes.
9. Replace no.1 and no.2 without no.6.
Screw no.9's down on no.8. Adjust the
5
pair of no.9's so they are flush with
the top of no.2 and jammed together.
4
3
Item no.4 to be attached to floor
only after final test for leaks has
been completed.
8
6
2
8
9
2
Tabla de contenido
loading

Este manual también es adecuado para:

B-0181B-0185B-0190B-0195B-0196

Tabla de contenido