English
2.6
Safety instructions for installation
and maintenance work
2.7
Unauthorised modification and
manufacture of spare parts
2.8
Improper use
3
Transport and interim storage
3.1
Shipping
Transport inspection
Storage
4
Intended use
Purpose
Fields of application
Contraindications
18
The operator must ensure that all installation and maintenance work
is carried out by authorised and qualified personnel who are suffi-
ciently informed from their own detailed study of the operating
instructions.
Work on the product/unit may only be carried out when the system is
at a standstill. It is mandatory that the procedure described in the
installation and operating instructions for shutting down the product/
unit be complied with.
Immediately on conclusion of the work, all safety and protective
devices must be put back in position and/or recommissioned.
Unauthorised modification and manufacture of spare parts will impair
the safety of the product/personnel and will make void the manufac-
turer's declarations regarding safety.
Modifications to the product are only permissible after consultation
with the manufacturer. Original spare parts and accessories author-
ised by the manufacturer ensure safety. The use of other parts will
absolve us of liability for consequential events.
The operating safety of the supplied product is only guaranteed
for conventional use in accordance with Section 4 of the operating
instructions. The limit values must on no account fall under or exceed
those specified in the catalogue/data sheet.
The pump is enclosed in a box or lashed to a pallet ex works and is pro-
tected against dirt and moisture.
On arrival, inspect the pump immediately for any transport damage.
If damage is detected, the necessary steps involving the forwarding
agent must be taken within the specified period.
Before installation and/or during interim storage, the pump must be
kept dry, frost-free and protected from mechanical damage.
CAUTION! Risk of damage due to incorrect packaging!
If the pump is transported again at a later time, it must be packaged
so that it cannot be damaged during transport.
• Use the original packaging for this, or choose equivalent packag-
ing.
IP-Z series glanded pumps are used for pumping drinking water as
well as cold and hot water (in accordance with VDI 2035) without
abrasive or aggressive substances.
They may be used for:
• Drinking water distribution systems
• Low-pressure heating systems
• Air-conditioning systems
• Cooling water systems
Typical installation locations are technical rooms within the building
with other domestic installations. Installing the device directly in
other used rooms (residential and work rooms) is not intended.
WILO SE 11/2017