Preparation For Operation - GRAPHITE 58G874 Manual Del Usuario

Ocultar thumbs Ver también para 58G874:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 79
MEANING OF SYMBOLS
CAUTION
WARNING
ASSEMBLY/SETTINGS
INFORMATION
EQUIPMENT AND ACCESSORIES
1.
Drills
2.
Chisels
3.
Depth gauge
4.
Dust cover
5.
Grease container
6.
Special key
7.
Transport case
INSTALLATION AND REPLACEMENT OF WORKING TOOLS
Hammer drill is designed to operate with working tools with SDS-MAX shanks.
Prior to starting operation clean the hammer drill and working tools. Use grease and apply thin layer onto
shank of the working tool. It will improve tool durability.
Disconnect the power tool from power supply.
Put the hammer against work bench.
Hold the fixing sleeve (
resistance.
Insert working tool shank into the chuck and slide it to mechanical stop (it may be necessary to turn the
working tool so it can reach appropriate position) (fig. A).
Release the fixing sleeve (
Working tool is properly seated if it cannot be removed without pulling off the fixing sleeve.
If the sleeve does not return to its default position, remove the working tool and repeat the whole
operation.
High efficiency of the hammer drill operation can be achieved by using sharp and undamaged
working tools.
DEINSTALLATION OF WORKING TOOL
Just after the operation is finished, the working tool may be hot. Avoid direct contact and use
appropriate protective gloves. Clean the working tool after removal.
Disconnect the power tool from power supply.
Pull the fixing sleeve (
Remove the working tool with your second hand by pulling it to the front.
OVERLOAD CLUTCH
Hammer drill is equipped with factory set overload clutch. Spindle of the hammer drill stops immediately
after working tool jams, which might overload the power tool.
SWITCHING ON / SWITCHING OFF
The mains voltage must match the voltage on the rating plate of the hammer drill.
Switching on – press the switch button (5) and hold in this position (fig. B).
Switching off – release pressure on the switch (5).
- 1 pce
- 1 pce
- 1 pce
- 1 pce
- 1 pce
- 1 pce
- 1 pce

PREPARATION FOR OPERATION

2) of the SDS chuck (1) and pull it to the back, overcoming the spring
2), it will finally fix the tool.
2) to the back and hold.
OPERATION / SETTINGS
11
Tabla de contenido
loading

Tabla de contenido