Installation Manual; Unpacking; Assembling The Shredder; Operation - Deltafox DG-ESS 2844B Traducción Del Manual De Instrucciones Original

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 74
GB
Service Centre.
• Only use extension cables
that have been approved for
outdoor use and are resist-
ant to splash water. The core
diameter for extension cables
measuring up to 25 m must be
at least 2.5 mm², and 2.5 mm²
for cables longer than 25m.
Always roll the whole cable off
the reel before use. Check the
cable for damage.
• Do not unplug the shredder
by the cable. Keep the cable
away from heat, oil and sharp
edges.

Installation manual

Unpacking

1.
Remove the shredder from the
packaging.
2.
Make sure that the on/off
switch (
on "O".
3.
For packaging reasons, the
chassis (10) is folded up. Turn
both handles on the chassis
(10) down.

Assembling the shredder

1.
Screw the two wheels (12) to
the chassis (10) with the inclu-
ded mounting material in the
order shown. Insert the Allen
key (20), included in the scope
of delivery, into the hole on the
axis (21) to hold in place and
prevent it from turning as well.
A suitable spanner (22) is also
enclosed.
2.
Clip the covering caps (19) into
the wheels (12).
28
6) is set to the positi-
3.
Make sure that the on/off
switch (6) is set to the position
"O".
4.
Push the collecting box (11) into
the chassis (10), with the safety
switch (10) on the side of the
wheels (13). The collecting box
(11) can be pushed in only in
one direction.
5.
Lock the collector box (11) by
pushing the safety switch (14)
to the
6.
To unlock the collection box,
move the safety switch (14) to
the bottom position.

Operation

Start-up

Before initial start-up, check that the
collection box (
11) and the safety switch
(
14) are in the correct position.
The shredder cannot be switched
on before the collector box and
safety switch are in their proper
positions.
Switching the shredder on and off
Make sure that the mains power
voltage agrees with the type plate
on the shredder.
1.
Make a loop at the end of the
extension cable and hang the
loop onto the strain relief (16)
on the mains cable (17).
2.
Connect the extension cable.
3.
Make sure that the funnel feed-
er
(
3)
4.
Move the direction switch (1) to
position "I" (forwards).
)
position.
is empty.
Tabla de contenido
loading

Este manual también es adecuado para:

Dg-ess 2844

Tabla de contenido