STEP 2 – Support Assembly
A.
Slide all Vertical Leg Extensions (6) onto the
LegBase(5) as shown
B.
Locate Vertical Leg Extensions (6) over Leg
Base(5), ensuring the button pin is fully located in
the location hole as shown to prevent
disconnection.
STEP 3 - Top Rail Assembly
A.
Two people will be necessary at this point to
assemble the trampoline. One person lifts the
Support Assembly from step 2 to a standing
(vertical) position and inserts one of the sockets
of the Top Rail with Sockets (3) into the Vertical
Leg Extension portion of the Support Assembly.
The other person holds the other end and inserts
that portion into the other Support Assembly as
shown. You should now have 2 Support
Assemblies held together by 1 Top Rail with
Socket. Ensuring Using take Screw, Flat Washer
,Safety Nut and connect to the Top Rail with
Sockets (3) to prevent disconnection. Important:
if a trampoline enclosure has been purchased at
the same time refer to the trampoline enclosure
instructions at this point.
Ensure button pins face inside from the
trampoline as shown to maintain hole alignment
of Trampoline Enclosure assembly.
B.
Now, install the other 4 Top Rails(4) into the
gaps between the Vertical Leg Extensions (3) by
inserting them into the slots as shown.
STEP 4 – Montaggio tappeto elastico
When Attaching springs to the trampoline mat, Please
be careful. You will need another person to help you with
this portion of the assembly. CAREFUL-When attaching
the Springs, the Connector Points can become pinch
points since the trampoline is tightening up.