Supplies Required; Secure Base To Floor; Assemble Components; Connect Water Supply - Bradley S19-310UU Instrucciones De Instalación

Combinación de ducha de aspersión y lavaojos
Ocultar thumbs Ver también para S19-310UU:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

S19-310UU

Supplies Required

• (3) 3⁄8" floor anchors and bolts
• Teflon tape and pipe sealant
• Piping to 1¼" NPT water supply inlet and 1¼" NPT
drain outlet on unit
• Adequate supply pipe supports
• Minimum 4" (102mm) drain to accommodate 30
gallons (115 liters) per minute discharge for shower
waste
• OPTIONAL: sign-mounting hardware
Local codes may require the installation of a
backflow prevention valve to complete proper
installation. Backflow prevention valves are not
included with the fixture and may be supplied by the
contractor or purchased from Bradley Corporation.

Secure base to floor

1. Install three suitable anchors (supplied by installer) for
3/8 bolts in the floor.
2. Bolt the base to the floor anchors using 3/8" bolts
(supplied by installer).

Assemble components

1. Assemble the remaining unit components as shown
on page 4.
2. Apply pipe sealant (by installer) to all male-threaded
pipe joints.
3. Use the rubber grip pad provided or a strap wrench
around pipes when tightening to prevent marring.
Place the grip pad on the pipe, then put the wrench
over the grip pad and turn the pipe with the wrench.
4. When connecting the steel chain, first connect the
chain to the "S" hook on the foot treadle. Then, with
the foot treadle raised up, straighten the chain and
connect a link to the "S" hook on the valve handle.
Make sure the chain is pulled tight. The length of chain
will vary.
5. Bottom edge of the showerhead should be 85"
(2159mm) from floor.

Connect water supply

NOTICE! Do not rely on Bradley's Combination Unit
to support supply piping.
1. Connect water supply piping to 1¼" NPT inlet on unit
(piping by installer). Provide adequate supports (by
installer) for supply pipe using pipe hangers or other
means.
2. Connect drain piping to 1¼" NPT drain outlet on unit
(piping by installer).
3. Hang the safety sign from the unit with the curtain
hooks provided (or mount it to the wall using sign-
mounting hardware by installer).
4. Open water supply lines. Test for leaks and adequate
water flow.
4
2/15/2021
25-1/4"
6"
(641mm)
(152mm)
85"
(2159mm)
to Bottom
of Base
65⁷⁄₈"
(1692mm)
to Bottom
of Base
Top View
From Bowl
Ø 10¾"
(273mm)
10½"
(267mm)
All dimensions assume standard thread
engagement. Variations in manufacturing
allow for +/- 1/8" (3mm) per threaded joint.
To find the tolerance of a dimension, add
the number of thread joints in between a
dimension and multiply it by 1/8" (3mm).
Bradley • 215-163UU Rev. C: ECO 19-05-034A
Installation
94"
(2384mm)
to Bottom
of Base
66"
(1676mm)
to Bottom
of Base
42"
(1067mm)
to Bottom
of Base
6"
(152mm)
9½" (241mm)
Ø 9" (229mm)
Flange with (3) Ø
3⁄8" (10mm) Holes
on Ø 8" (203mm)
Bolt Circle
Tabla de contenido
loading

Tabla de contenido