Setting At Work; Gas Installation Switch-On (For + Gas Machines Only) - La Cimbali M39Classic Uso E Instalacion

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75
"Before using the machine make sure that:
the main electricity supply ON/OFF switch is ON;
the water supply and water softener taps are open."
Turn the main switch (14) to position 1. The "machine ON"
indicator light (4) lights up.
If the water level in the boiler is below the minimum level, the
automatic level indicator light (5) lights up, and the boiler is
filled up to the optimal level (indicator light 5 OFF).
Turn the main ON/OFF switch (14) to position 2.
"Heating" now begins.
At the end of the day, turn the machine OFF by turning the
main ON/OFF switch (14) to position 0.

8. Gas installation switch-on (for + GAS machines only)

"Don't switch on the gas installation when the
boiler is under pressure ".
Before using the machine check that:
- the main electricity supply ON/OFF switch is ON;
- the main water supply tap is open .
- the gas supply tap is open.
Turn the main switch ON/OFF (14) to position 1.
The machine completes the operations described under "
Daily Switch-On ".
Press and turn the gas tap knob (19) counter-clockwise and
repeatedly press the piezoelectric switch-on push-button (Pz)
until the burner under the boiler lights up.
Check through the observation window that the burner is lit
and, after a few seconds, release the knob (19).
"Heating" now begins.
At the end of the day, switch off the machine by turning the
ON/OFF switch (14) to the "0" position and close the gas tap
(19) by turning it to the "0" position.
USE

7. Setting at work

14
31
4
5
19
Pz
loading