Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4) Installation of the Valve
1) Fill the installation valve opening with
plumber's putty or alike.
2) Again,
make sure with the guard cover
provided that distance between Finished
Wall surface and valve falls between MIN
and MAX.
If the distance is beyond the MIN and MAX
limit, valve trim cannot be mounted
properly.
Must confirm wall, both rough and
finished, thickness and distance to the
valve before installing the valve.
Caution
Leave the guard covers on all the valves till the
tile work is completed.

Before Use

Confirm the temperature of the water output.
1) Set the temperature control handle in the Mark at
"104" and confirm that output temperature is 104°F.
2) If temperature output is not 104°F, following adjustment
should be done.
To prevent scalding, the recommended hot water
temperature is 140°F (60°).
Confirming the outlet temperature and calibrating the valve
is required to minimize the risks of scalding.
After calibrated, the outlet temperature must read 104°F while
the temperature control handle knob is in the middle.
(the Finished Wall)
Guard
Cover
Guard Cover
Thermostatic Mixing
Valve
(after trims are installed)
Lower LImit
Guard Cover
Dual Volume
Control Valve
Single Volume
Control Valve
Guard Cover
Volume
Control
Handle
HOT
KNOB
COLD
Handle
about 104°F
Finished
Wall
Upper LImit
Guard
Cover
Handshower
Adapter
8
Tabla de contenido
loading

Este manual también es adecuado para:

Renesse tskt

Tabla de contenido