Manual Procedure; High Precision Recovery - Sun Blizzard Qtech III Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 455

MANUAL PROCEDURE

In the MANUAL PROCEDURE, all the operations can be performed singly to the exception of
the recovery/recycling phase, which is automatically followed by used oil discharge.
The values for the quantity of gas recovered, quantity of oil recovered, vacuum time, quantity of
oil reintegrated, and quantity of gas charged into the system are automatically printed at the
end of each single operation.
From the MAIN MENU:
Select the MANUAL PROCEDURE, the following screen will be displayed:

HIGH PRECISION RECOVERY

Connect the hoses to the A/C system with the quick-connect couplings, bearing in mind that
BLUE must be connected to the low-pressure side and RED to high pressure.
If the A/C system is equipped with a single quick-connect coupling for high or low pressure,
connect only the relative hose.
From MANUAL PROCEDURE, select HIGH PRECISION RECOVERY, the following screen
will be displayed:
Type the plate of the car, press OK to confirm. BACK to return back.
NOTE: the numerical keys include an alphabet that is used similar to text messaging; for
example: press "2" once to display "A", twice to display "B", three time for "C", four time for "2".
the following screen will be displayed:
INSTRUCTIONS MANUAL
AUTOMATIC
MANUAL
CUSTOM
SETUP
MAINTENANCE
R134a
RECOVERY & REC.
RECOVERY & REC.
OIL – UV INJECTION
GAS FILLING
R134a
Inset vehicle
Plate number:
RECOVERY / RECYCLING
-40-
DATA
MANUAL PROCEDURE
VACUUM
DEVICES
MANUAL PROCEDURE
Tabla de contenido
loading

Productos relacionados para Sun Blizzard Qtech III

Tabla de contenido