Maxon 297115-01 Instrucciones página 7

Idiomas disponibles

Idiomas disponibles

5. Unbolt and remove pump cover
(FIG. 7-1).
6. Disconnect battery cable from
starter solenoid (FIG. 7-1A).
Remove existing grommet
from pump mounting plate
(FIG. 7-1A). Insert new grom-
met (Kit item) into pump
mounting plate (FIG. 7-1B).
CAUTION
Do not over-tighten the terminal
nuts. For the 5/16" load terminals,
torque nuts to 35 lb-in. Torque
the nuts on #10-32 control termi-
nals to 15 lb-in.
7. Insert switch wiring through
new grommet on pump
mounting plate (FIG. 7-1A).
Then, connect the switch wir-
ing to the junction block (FIG.
8-1) or power down module
(FIG. 8-2) as shown on the
next page.
8. Reconnect battery cable to starter
solenoid (FIG. 7-1B).
9. Bolt on the pump cover as shown
in FIG. 7-1.
© MAXON Lift Corp. 2018
LIFT CORPORATION Sht. 7 of 18 DSG#
M-16-08
BATTERY CABLE &
TERMINAL LUG
OLD GROMMET
TERMINAL
NUT & LOCK
WASHER
STARTER
SOLENOID
BATTERY CABLE &
TERMINAL LUG
DUAL SWITCH
WIRING
NEW GROMMET
TERMINAL
NUT & LOCK
WASHER
STARTER
SOLENOID
BOLTING / UNBOLTING PUMP COVER
Rev. A Date: 07/02/18
OLD GROMMET
FIG. 7-1A
NEW GROMMET
FIG. 7-1B
FIG. 7-1
loading