Step 3: Pass the signal wire through the front locking area of the console structure (as shown in
the drawing) and then to the vertical column with four M8 * 15 Screw hexagon domed head (lock
the screws).
Step 4: Tighten the screws with the tools and insert the foot protectors into the side rail guide,
and the installation is complete.
11