Translation of
the original
notice
Clamping jaws change:
1- Connection cone jaws M0042
2- Cone jaws M0043
3- Jaws 058446
4- Spreader M0044
5- Spring 55189
6- Extension M0041
7- Pusher 93058
8- Spring 55223
9- Joint 55133
Unscrew 2 with the spanners
Replace the jaws 3 and then position them in 3 at 120°.
Place 4, 5, 7 and 8 in succession. Then screw in 6 with the spanners (tighten well).
Extraction of self-piercing rivets: (see previous chapter)
KIT 4
ASSEMBLY ORDER OF KIT 4:
Assembly order of kit 4:
3
4
1- Set the Tailpipe 1.
2- Screw on the jaw support 2 with the 2
spanners (tighten well)
3- Screw on nozzle holder 3 with the 2 span-
ners.
4- Screw the nozzle Ø6 ref: 066052.
5- Thread the recovery bowl 5.
Blind rivet setting:
After fitting the appropriate nozzle, place the rivet as far as the nozzle end stop
Place the rivet through the hole in the sheets to be riveted and press the riveter trigger according to the model below:
50KN BLIND RIVET ADAPTER FOR 10T RIVETER
1
6
1
2
Clé de serrage
8
7
5
4
To facilitate the installation of the nozzles:
• 1- Position a rivet into the nozzle.
• 2- Insert the rivet with the nozzle into the assembled sup-
port.
• 3- Tighten the nozzle with a spanner.
1-
2-
EN
1
3
2
5
3-