!
WARNING
Read this Manual BEFORE using this equipment.
Failure to read and follow all safety and use information
can result in death, serious personal injury, property
damage, or damage to the equipment.
Keep this Manual for future reference.
Installation Instructions
In addition to protection from freezing, the anti-siphon protects
against possible back siphonage into the water supply system.
Provides a year round supply of outside water without fear of
pipes freezing and bursting.
NOTICE
Hose must be removed to allow water to drain to prevent
freezing.
NOTICE
A. Hose end must be installed sufficiently lower than seat end
to allow for proper drainage.
B. Open valve before heating seat end for solder connection
to avoid burning the rubber seat washer.
The frost-proof sill cock assures no-freeze operation because
the valve mechanism shuts off water inside the building. If
building will be unheated for any length of time, all water lines
should be drained and plumbing fixtures winterized.
A plastic siding wedge is provided to compensate for lap sid-
ing installations. Slip the wedge between
frost-proof flange and siding to form
an attractive finish and solid base for
mounting.
Secure sill cock flange with two #8 or #10
ovalhead wood screws (of proper length)
or with appropriate masonry hardware.
SIDING WEDGE
Installer – For PEX Connections:
A. Hose end must be installed sufficiently lower than the seat/PEX
end to allow for proper drainage.
B. Follow PEX tubing manufacturer's crimp joining instructions.
Watts PEX end freezeless wall hydrants conform to ASTM
F1807-04 PEX end specifications.
Crimp outside diameters should fall within these dimensions when
measured with a micrometer or caliper.
Ring size
Minimum
Maximum
in
mm
1
/
15
0.700"
0.715"
2
Service Notes - Repair Kits
1. Remove handle screw, handle and nameplate. Unscrew packing nut
and remove 2 packing washers and packing. Using handle, unscrew
stem assembly until threads disengage and slide out.
2. Remove old check sub-assembly by pulling it straight out from the
end of the check stem. Remove old check spring. Replace with new
check spring and check sub-assembly. (Push new assembly in by
hand).
3. Reinsert stem assembly by following step 1 in reverse.
NOTICE
* Prior to performing service to the Frost Free Sill Cock stem assembly,
water supply to the unit must be shut off and the pressure drained from
the valve.
Vacuum Breaker Cover
Plastic Bonnet
O-ring*
Packing Nut
Disc*
Vent Float*
Check
Washer
Spring**
Stem
Seat End
Hose End
Packing**
Check
Washer
Sub-Assembly**
Nameplate
Stem
Screw
Handle