Operation - Glacier bay FW0AC000CP Guía De Instalación Y Cuidado

Grifo para lavabo con manijas de abertura amplia
Ocultar thumbs Ver también para FW0AC000CP:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation (continued)
9
Attaching the quick connecting
hose
Remove the cap from the quick connect hose.
Attach the quick connecting hose (I) connections to
the hot faucet handle (A) connection, faucet body (J)
connection, and cold faucet handle (K) connection.
Push until the connections snap together.
Pull down moderately to ensure the connection has
been made.
J
A

Operation

1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove
the aerator to the flush the water lines. Do not lose the
gasket in the aerator.
Ensuring the handles are in the off position, turn on
the water supply and check for leaks. If you discover
any leaks, check your connections to ensure they are
installed properly.
Use a coin to remove the aerator (B) from the faucet
(J). Turn on the hot and cold handles to allow the water
to run for at least one minute. This flushes away any
debris that could cause damage to internal parts.
Turn off the water and reinstall the aerator and housing
(if applicable).
K
I
10
Connecting the supply lines
Use 1/2 in. I.P.S. faucet connections (1), or a 3/8 in.
O.D. ball-nose riser (2) with supply line coupling nuts
(3) (not included).
Use two wrenches to tighten the connections. Do not
over tighten or torque the copper supply line.
1
A
B
8
2
3
J
K

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

277-531

Tabla de contenido