Plastic Bowl - Bradley S19-210 Guia De Inicio Rapido

Lavaojos montado en pedestal con receptor de plástico
Ocultar thumbs Ver también para S19-210:
Tabla de contenido
S19-210, S19-210B
Assembly of Components - S19-210 (Plastic Bowl)
4.6
4.5
Flow Control
4.4
4.3
4.2
4.1
Figure 2a
4
4.8
4.7
4
This End
1/2" IPS
Supply Inlet
7
5
6
8
3
10
2
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
1-1/4" IPS
114-051
Drain Outlet
1
P.O. Box 309, Menomonee Falls, WI 53051
TEST THIS UNIT EACH WEEK
DIESES GERÄT 1ST WÖCHENTLICH ZU PRÜFEN.
ESSAI HEBDOMADAIRE
Test-operate valve(s) each week and sign below.
Report any malfunctions immediately.
Ventil(e) wöchentlich im Testbetrieb prüfen, bestätigt
durch Unterschrift. Jegliche Störung sofort melden.
Test le fonctionnement des valves chaque semaine et
11
signe en bas. S'il y à quelque chose qui ne va pas fait
un rapport immédiatement.
Date
Datum
Date
6/26/07
Item
Part No.
1
131-059
2
169-727
3
113-006LC
4
S90-284
4.1
111-039
4.2
124-028
4.3
154-058
4.4
173-025
4.5
S21-071
4.6
113-1185
4.7
S05-091
4.8
107-371
5
113-006LQ
6
169-025
7
S27-282
9
7.1
110-215
8
128-135
7.1
9
142-002DA
10
114-051
11
204-421
12
269-915
Prepack S45-122 includes Items 7, 7.1, 8, 9
Prepack S45-123 includes Items 7.1, 8, 9
Prepack S45-1785 includes Items 4.2, 4.4, 4.5, 4.6
FAX: (262-251-5817)
http://www.bradleycorp.com
R
Signed
Date
Signed
Unterschrift
Date
Signed
Signe
Date
Signed
NOTE: Items 4.1–4.8 come preassembled as Item 4.
Bradley Corporation • 215-155 Rev. V; EN 06-532D
Installation
Qty
Description
1
Base
1
Pipe Tee 1-1/4" IPS
1
Pipe 1-1/4" IPS x 27-1/2"
1
Plastic Bowl Assembly
1
Inlet Drain Fitting
1
Gasket
1

Plastic Bowl

1
Cup Strainer
1
Supply Pipe Assembly
1
Spacer, Drain
1
Eyewash Yoke Assembly
2
Tethered Dust Cover
1
1/2" NPT Pipe
1
Elbow, 1/2" Street
1
1/2" Ball Valve w/Nut
1
Nut only
1
Eyewash Handle
1
Washer
1
Safety Sign
1
Emergency Tag
1
Grip Pad (not shown)
Tabla de contenido
loading

Este manual también es adecuado para:

S19-210b

Tabla de contenido