In case that the available
height at the stern is insuf-
ficient for the installation of
the stern thruster a sloped
surface can be made to
install the stern thruster.
Than keep in mind that the
thrust tunnel must be pro-
tected against the forces
caused by the water flow
during normal cruising.
Installation in the bottom
of the vessel is not recom-
mended. The thrust tunnel
is not designed to with-
stand the forces of the
water flow during normal
cruising. At the same time
also the normal propul-
sion is highly slowed
down.
Installation of the flange
At the place of installation of the stern thruster attach the drill
pattern at the outside and mark the holes.
The drill pattern is on the centre
page.
IMPORTANT: The centerline of the drill pattern must be pre-
cisely horizontally and at least 150mm below the waterline.
For checking purposes drill first a small hole at the location of
the centre point of the flange. On the inside checking the avail-
able space for flange and motor can now be carried out easily.
Make the holes, depend-
ent of the material of the
ship's hull by means of a
drill and a jigsaw or with
an oxy-acetylene cutter.
Make sure that the holes
are free of burrs.
Installation set for stern thruster '35 kgf' and '55 kgf'
Type
ø D
ø d
'35 kgf'
146 (5
3
/
")
8,2 (0.32")
4
'55 kgf'
For type '35 kgf' only:
Place the extra gasket
in the flange.
Apply a sealant to the
mounting surface (
)
of
the
flange
(a
polyurethane sealant e.g.
Sikaflex
®
-292) and posi-
tion the flange onto the
hull.
Install the flange with the
supplied bolts, nuts and
washers.
Install the 2 supplied zinc
anodes.
Install de thrust tunnel
onto the flange with the
supplied bolts en washers.
Provide
these
bolts,
M6x40, with a screwlock.
Installation of the 'bow thruster'
The 'bow thruster' must be installed in accordance with the rel-
evant bow thruster instruction.
Check
whether
the
distance
between the tips of the propeller
blades and the inside of the thrust
tunnel is exactly the same all along
the periphery.
ENGLISH
5
2.0524