Complete The Installation - Kohler K-1845 Guia De Instalacion

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Apply color-matched
silicone sealant.
End Cap
Grip Rail

10. Complete the Installation

Complete the finished wall.
Apply color-matched silicone sealant to the seam between the hand rail and the tile. Do not use
grout for this seam.
Allow the silicone sealant to dry following the sealant manufacturer's directions.
Kohler Co.
13
Apply color-matched
silicone sealant.
1091559-2-B
Tabla de contenido
loading

Este manual también es adecuado para:

K-1846

Tabla de contenido