Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Once a suitable location is selected, drill a 32mm diameter hole in the pipe.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the O-ring in the groove on the inside face of the top half of the pipe clamp.
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
The flow switch should not be mounted on the underside of horizontal pipes.
the pipe.
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
Place the top half of the pipe clamp onto the pipe ensuring that the hole in the pipe cla
the pipe.
the pipe.
11