Complete The Installation - Kohler K-4920-T Guia De Instalacion

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

2. Install the Urinal
The sides should have at least 1/2" (13 mm) of sand cushion.
For proper drainage, the lip of the urinal should be installed
below the floor level.
The finished floor should slope toward the urinal lip.
CAUTION: Risk of personal injury. Handle with care.
Vitreous china can break or chip if the product is handled
carelessly.
Carefully position the urinal in the sand cushion.
Use a level to adjust the urinal in the sand cushion.
Install the finished floor.
NOTE: Do not rigidly secure the urinal to the floor or walls.
Fill the gap between the urinal and the finished floor with
waterproof compound.

3. Complete the Installation

IMPORTANT: This urinal requires a .5 gpf (1.9 lpf) to 1 gpf (3.8 lpf)
flush valve.
Install the flush valve according to the manufacturer's
instructions.
Connect the water supply and complete the waste pipe
connections.
Kohler Co.
Sand Cushion
5
1013946-2-C
Tabla de contenido
loading

Este manual también es adecuado para:

K-4920-r

Tabla de contenido