Configuration manual
Diesel generator
These are the settings for configuring a Diesel generator:
46
transfer ratio (Watt
transfer ramp is defined in watts/minute.
/ minute)
Power that the system will exchange with the
electrical grid. A positive value indicates that
Power Control:
power will be imported from the grid. A negative
value indicates that power will be exported to the
Grid Power Target
grid.
(Watt)
In a three-phase system the value specified in
this setting will be the sum of the value of each
phase.
Electrical grid power meter identifier.
Power meter Id
Setting
When the generator power is transferred to the
system, this transfer can be done smoothly. The
Maximum power
transfer ramp is defined between the maximum
transfer ratio
admissible power variation (referred to the
(%pfv/minute)
nominal power of the photovoltaic installation) in
one minute.
The system will never decrease the output power
below this value.
Please contact the manufacturer for the
Minimum load
minimum power recommended for the generator
threshold power
to operate under.
In a three-phase system the value specified in
(Watt)
this setting will be the sum of the value of each
phase.
Identifier for the wattmeter linked to the
generator.
Power meter Id
Description
AAX2026IQM05_B.docx
Ingeteam