Ingeteam INGECON SUN EMS Manual De Configuración página 45

Ocultar thumbs Ver también para INGECON SUN EMS:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Ingeteam
PV inverters
Battery inverters (with photovoltaic generation)
Electric vehicle charging stations
In addition to the above physical devices, there are two virtual elements that must be configured
in the installation:
·
Electrical grid.
·
Diesel generator.
Electrical grid
AAX2026IQM05_B.docx
Setting
Electric phase that the inverter is connected to.
For single-phase installations with single-phase
inverters, select phase R.
Phase
For three-phase installations with single-phase
inverters, select the corresponding phase.
For three-phase installations with three-phase
inverters, select THREE-PHASE.
Setting
Minimum battery charge status. Once reached
the battery stops discharging. See the
Minimum
manufacturer recommendations to specify this
SOC/VBat
setting.
Maximum battery charge status. Once reached
Maximum
the battery stops charging. A value of 100% is
recommended for this setting.
SOC/VBat
Electric phase that the inverter is connected to.
Phase
For single-phase installations with single-phase
inverters, select phase R.
Setting
Maximum charging power for vehicles from the
electrical grid. The available power can be
Max. recharging
increased according to the photovoltaic
power from grid
generation. In a three-phase system the value
specified in this setting will be the sum of the
value of each phase.
Setting
Power contracted in the installation, which must
not be exceeded by the consumption. In a three-
Contracted Power
phase system the value specified in this setting
(Watt)
will be the sum of the value of each phase.
When the generator power is transferred to the
Maximum power
system, this transfer can be done smoothly. The
Configuration manual
Description
Description
Description
Description
45

Hide quick links:

Capítulos

Tabla de contenido
loading

Tabla de contenido