DESCRIPTION OF TERMINALS
]
LINE IN
System bus connection
]
CP
Floor call
}
S+
Call repetition
S-
INSTALLATION
•
Fix the bracket to the wall using a box 503 and the screws provided or a Ø 60 box with suitable
screws.
•
Program the dip switches.
•
Connect the wires from the system to the terminal board.
•
Couple the monitor to the bracket and lock it by screwing fastening screws A.
6
503 box
A
A
Ø 4 mm max
slotted head or
Phillips cross head
Ø 60 box
DS1750-003B