Uline H-951 Manual Del Usuario página 4

Ocultar thumbs Ver también para H-951:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5. Using 10 mm socket,
remove two metal
straps that secured the
tunnel to pallet.
(See Figure 5)
6. Using 10 mm socket,
remove four rubber
bumpers. (See Figure 6)
7.
Remove leg set and included hardware from box.
(See Figure 7)
Figure 7
8. Hold one leg up to the bottom of tunnel. Make sure
the leg panel is facing outward and along the width
of tunnel. (See Figure 8)
Figure 8
PAGE 4 OF 21
INSTALLING LEG KIT USING FORKLIFT CONTINUED
Leg
9. Secure leg to tunnel
Figure 5
with six bolts, three in
each corner.
(See Figure 9)
10. Repeat step 8 and 9 with the other leg.
Figure 6
11. Lower forklift till shrink tunnel is resting on the ground.
Remove forks from unit.
12. Finished unit with legs. (See Figure 10)
Figure 10
Figure 9
0421 IH-951
Tabla de contenido
loading

Tabla de contenido