Kohler Sterling 95334-0 Guia De Instalacion página 8

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Temporary Blocks
5. Install the Bath
NOTICE: To avoid damaging the finish of the bath, make sure there is a drop cloth or other protective
liner in the bath before proceeding.
NOTE: To provide access for securing the faucet connections, position temporary blocks between the
apron and the bath rim.
With help, carefully lift the bath into place over the shroud and onto the temporary blocks.
For a rim-mount faucet, install the faucet and trim according to the faucet and trim instructions.
Make sure that there is adequate support under the bath rim to support the faucet. Refer to the
"Prepare the Rim-Mount Faucet (Optional)" section.
Carefully remove the temporary blocks and make sure that the bath rim engages the top of the
shroud on all sides.
Connect the drain.
Thread the drain cap into the drain.
Press the drain cap down several times to ensure the drain opens and closes properly.
Close the drain. Fill the bath to the overflow, and check for leaks.
Apply a thin, continuous bead of clear or color-matched 100% silicone sealant to the seam between
the shroud and the finished floor.
1383921-2-B
8
Bath Drain
Drain Pipe
Sterling
Tabla de contenido
loading

Tabla de contenido