Shut Down Procedures - Landa PDE2-1100 Manual Del Operador

Tabla de contenido
PDE SERIES PRESSURE WASHER
6

SHUT DOWN PROCEDURES

1. Rinse all lines (and injector) with clean water, to re-
move any soap residue.
2. Turn power switch to OFF position.
3. Turn off water supply.
4. Open spray gun to relieve remaining pressure.
5. Remove water supply hose.
6. In freezing conditions, disconnect water supply and
open spray gun to allow water to drain, then turn off
motor.
CAUTION: Do not allow pump to run longer than 5
minutes without water. Disconnect all hoses to al-
low water to drain.
CAUTION: With machine off, open spray gun to re-
lease pressure before removing discharge hose.
LANDA PDE • REV. 9/02
OPERATOR'S MANUAL
Tabla de contenido
loading

Este manual también es adecuado para:

Pde2-1500Pde3-1500Pde4-2000Pde4-3000

Tabla de contenido