How to Assemble Your Ceiling Fan (continued)
5. Route wires and safety cable through motor coupling
cover, canopy screw cover and ceiling canopy. (Figure 5)
6. Reinstall the hanger ball on the downrod as follows.
Route the black, white and blue wires and safety cable
through the hanger ball. Position the pin through the two
holes in the downrod and align the hanger ball so the pin
is captured in the groove in the top of the hanger ball.
Pull the hanger ball up tight against the pin. Securely
tighten the set screw in the hanger ball. A loose set
screw could create fan wobble. (Figure 6)
7. Cut off excess lead wire approximately 6 to 9 inches
above the top of the downrod. Strip insulation off
1/2 inch from the end of each lead wire. (Figure 7)
CAUTION
All set screws must be checked, and retightened where
necessary before installation.
8. Remove one of the two shoulder screws in the
hanger bracket and retain the screw for later. Loosen
the second shoulder screw without fully removing it.
(Figure 8)
Motor Coupling
Cover
Hanger Bracket
8
Ceiling Canopy
Canopy Screw
Cover
Figure 5
Figure 6
Figure 7
Figure 8