5
ASSEMBLY
STEP
10
- CONTINUED
3
NAME
Nylon Hex Nut
M10
35
NAME
Int. Hex Screw Cyl. Head.
M10X40
38
NAME
Coupling ring
33
34
34
36
39
TOOLS
Allen no. 8
Fixed wrench
17
22
Qty
2x
Qty
36
2x
Qty
39
1x
34
34
22
34
22
37
38
37
36
44
100%
Pliers for
elastic rings
NAME
Pulley
NAME
Handle tip
NAME
Rubber sphere
BEFORE TENSIONING THE CABLE OF STEEL (FIGURE 34),
27
Qty
34
NAME
2x
Bushing
Qty
37
NAME
1x
Elastic ring
Qty
44
NAME
1x
Carabiner
35
38
ATTENTION!
ALIGN IT IN THE PULLEYS WITH THE STEEL
CABLE PROPERLY LINED MAKE TOP PLATE PULLEY
LOCK KEEPING THE DISTANCE BETWEEN THE NUTS
(FIGURE 34) AT THE END OF THE
TENSIONING GIVE THE FINAL TIGHTENING
ON THE NUTS.
THIS ASSEMBLY IS VALID FOR
PLUS AND STANDARD EQUIPMENT.
THE ASSEMBLY IS THE SAME FOR BOTH
Qty
4x
Qty
1x
Qty
1x
3
35
ATTENTION!
TOWERS