Panasonic TY-ST65PE8 Manual De Instrucciones página 20

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
Assembly Procedure
4. Display Overturn-Prevention
Fix the display both on the board and the wall.
To fix to the board
1) Assemble 2 overturn-prevention belts
on the back of the base with 2 screws
Screw
Tightening torque: 1.2 to 1.5 N•m
2) Fix the belts to the board with 2 wood screws
● To assemble to the board, use the prepared holes.
● If there are no prepared holes, drill new holes to the
center of the base board width.
[For safety reasons, always use the overturn/fall prevention accessories]
The equipment may overturn in the event of an earthquake etc. Therefore, always use the overturn/fall prevention
accessories.
* The details in this section indicate how to reduce any damage or injury caused by this equipment overturning or
falling due to an earthquake. However, there is no guarantee that the overturn/fall prevention accessories will be
effective in all earthquake situations.
To fix to the wall
Use a sturdy string, wire, or other such commercially available item and secure the string etc. to a secure
wall or pillar.
Handle
5. Removing the pedestal
Remove the display in an opposite way of "Assembly Procedure" after removing the power plug,
cables and overturn-prevention items.
● Please keep the removed items carefully for the time when assembling again.
20
(Cont'd)
to the holes
.
.
Overturn-prevention belt
Screw
Wood screw
String or wire
(commercially available), etc.
Surface of wall
Tabla de contenido
loading

Tabla de contenido