4. Connect the Wiring
NOTE: A licensed electrician should hard wire the sink to the 120 V,
15 A, 60 Hz dedicated circuit that was installed according to the
roughing-in details.
Remove the cover from the junction box.
Connect the power and ground wiring to the junction box in
accordance with local code requirements.
Use the two screws to replace the cover on the junction box.
Leave the power turned off at this time.
5. Connect the Plumbing
Install the sink strainer body to the cook center basin according to
the manufacturer's instructions.
If used, install the garbage disposal to the cook center basin drain
according to the manufacturer's instructions.
Install the cook center basin drain to the dedicated trap according
to the manufacturer's instructions.
Connect the faucet supply lines and complete the cook center
faucet installation as per the manufacturer's instructions.
Connect the cook sink drain to the second trap according to the
manufacturer's instructions. Do not install a garbage disposal on
the cook sink drain.
1032057-2-B
Junction Box
From Circuit
Breaker
8
Kohler Co.