Prepare The Site - Kohler Anthem K-28209-NA Instrucciones De Instalación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

2. Prepare the Site

3''
(76 mm)
Min
Drip Loop
IMPORTANT! The power supply must be installed within the stud framing, near the valve. Verify that the power supply
is installed above the valve and below the electrical outlet.
NOTICE: Do not install the valve in any location where the temperature may exceed 122°F (50°C).
NOTICE: This product can be mounted on a rigid backer board or telescopic brackets (not supplied).
NOTE: Horizontal installation within a stud cavity is shown. The valve can also be mounted vertically or mounted to a
horizontal surface. Refer to the "Mounting Configurations" section.
NOTE: This product is designed to fit within a minimum 14-1/2" (368 mm) stud cavity. Ensure that there is a minimum 3"
(76 mm) depth clearance.
Install a 120 V GFCI electrical outlet within the stud framing, near the valve. Locate the electrical outlet above the valve
and power supply.
Kohler Co.
Board Mount
Drip Loop
14-1/2''
(368 mm)
3''
(76 mm)
Min
Drip Loop
9
Bracket Mount
Drip Loop
14-1/2''
(368 mm)
1430527-2-A
Tabla de contenido
loading

Este manual también es adecuado para:

Anthem k-28209

Tabla de contenido