Install Kick Plate; Complete Installation - Jennair 30" Instrucciones De Instalación

Estufas de convección a gas estilo comercial
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Install Kick Plate

NOTE: Door must be removed in order to remove or replace kick
plate. Refer to the "Remove Door" section.
Align kick plate over the kick plate slots and push kick plate
down.
A
A. Kick plate
B. Kick plate tab
C. Kick plate slot
C
B

Complete Installation

1. Check that all parts are now installed. If there is an extra
part, go back through the steps to see which step was
skipped.
2. Check that you have all of your tools.
3. Dispose of/recycle all packaging materials.
4. For oven use and cleaning, read the Use and Care Guide.
Check Operation of Oven(s)
1. Turn power on.
2. Start a Bake cycle. See the Use and Care Guide for
operating instructions.
If oven(s) does not operate, check the following:
Household fuse is intact and tight or circuit breaker has not
tripped.
Electrical supply is connected.
See the "Troubleshooting" section in the Use and Care
Guide.
3. When oven has been on for 10–15 minutes, open the oven
door and feel for heat.
If you do not feel heat, turn off the oven and contact a
qualified technician.
If you need Assistance or Service:
Please reference the "Assistance or Service" section of the
Use and Care Guide or contact the dealer from whom you
purchased your range.
15
Tabla de contenido
loading

Productos relacionados para Jennair 30"

Este manual también es adecuado para:

36"48"

Tabla de contenido