Natural Gas Conversion Instructions:
1.
Remove the Cotter pins at the back of main burners to detach burners from bracket. Lift back of main burners
while sliding burners out of firebox, disengaging main burners from valves as shown
2.Unscrew the orifice from the valve with the orifice removal tool (Part QQ), put the new orifices (Part LL, 1.45mm)
into the valves and secure it with the wrench. Repeat this step for all four MAIN burners.
4