TOOLS AND MATERIALS
YOU WILL NEED
• Saw
• Duct tape
• Measuring tape or scale
• Carpenter's square
• Adjustable wrench or socket set (7/16" socket and
ratchet)
• Drill and drill bit
• 1/4" nut driver
• Sheet metal screws
• Pipe wrench
• Manual gas line shut-off valve
• Pipe joint sealant that resists action of LP gas
• Ductwork to suit the installation
For rigid connection:
• Shut-off valve
• Union
• Pipe fittings as required
For flexible connection where local codes permit:
• Flexible metal tubing (same 3/4" or 1/2" I.D. as gas
supply line)
30" COOKTOP (DIMENSIONS FOR REFERENCE ONLY)
Installation Instructions
PREPARATION
Unit shown fully assembled.
Unit must be vented to the outside!
17
"
21
7
⁄
8
22"
"
20
1
⁄
2
"
29
7
⁄
8
2
1
"
28
3
⁄
4
"
⁄
4