Prepare The Site - Kohler K-1737 Guia De Instalacion

Ocultar thumbs Ver también para K-1737:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Provide clearance
from wall.
6" (15.2 cm) from Floor

1. Prepare the Site

NOTE: This section continues the installation as described in the steam generator installation instructions.
Refer to the steam generator installation instructions guide for more information, if required.
NOTE: If two steam heads are required, ensure there is at least 12-1/2" (31.8 cm) between the center of
each hole. The steam heads do not need to be located in the same area.
Install the finished wall material.
Mark the temporary pipe nipple at the location of the finished wall surface.
Remove the temporary pipe nipple from the elbow.
Drill or cut a 2-1/2" (6.4 cm) hole centered around the elbow in the wall.
Kohler Co.
Wall Stud
2-1/2" (6.4 cm)
5
Mark the nipple even
with finished wall.
Temporary
Nipple
Wall Stud
1069332-2-C
Tabla de contenido
loading

Este manual también es adecuado para:

K-1838

Tabla de contenido