INSTALLATION INSTRUCTIONS
13. Attach power supply cord to discharge pipe using
cable or zip ties (not included) to allow the float switch
to move freely.
14. Connect pump power supply cord to a receptacle
protected by a ground fault circuit interruptor (GFCI).
15. Fill the basin with water to check operation. The pump
will start when the water level has reached the switch
"on" level. Refer to page 4 for "on" level.
13
14
15
9
© 2020. All rights reserved.
Cable or
Zip Ties
GFCI
protected
receptacle
On