Sime MURELLE 25 OF ErP Manual De Instrucciones página 84

Ocultar thumbs Ver también para MURELLE 25 OF ErP:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4.2.2 
Adjusting valve pressure (fig. 20)
Set. maximum. and. minimum. pressure. on.
gas.valves.as.follows.(fig..20):
5
–. Connect. the. column. or. a. manometer. to.
the.intake.downstream.of.the.gas.valve.
5
–. Remove.the.cap.(1).from.the.modulator.
3
–. Press.the.key.
.for.a.few.seconds.and.
completely. open. the. hot. sanitary. water.
1
faucet.
3
–. Press.the.key.
.
–. Remember. that. rotating. clockwise. will.
1
increase. pressure. while. rotating. anti-
2
clockwise.will.diminish.it..
–. Adjust.maximum.pressure.using.the.nut.
4
5
(3).with.a.wrench.to.the.maximum.pres-
2
sure.value.indicated.in.Table 4..
–. Adjust. the. maximum. pressure. before.
4
adjusting.the.minimum.
3
–. Press. the.
key. .
. while. the. sanitary.
water.tap.is.on,.with.the.water.running.
5
5
1
–. Lock.the.nut.(3).in.place,.turn.the.screw.
(2)..to.the.minimum.pressure.indicated.in.
Table 4..
3
–.
Press.the.keys..
and.
.
2
1
1
4
2
2
4
Codice/Code 8112910
Modello/Model MURELLE 25 OF ErP
Matricola/Serial n. 9999999999
PAR 1 = 9 (G20) / 11 (G30-G31)
PAR 2 = 5
84
the. hot. sanitary. water. running. all. the.
time,. and. check. that. the. maximum. and.
5
minimum. pressures. correspond. to. the.
set.values;.if.necessary.correct.the.regu-
lation.
–. Press. the. key.
ction.
1
–. Remove.the.manometer,.remembering.to.
tighten.the.screw.for.closing.the.pressu-
re.test.point.
3
while.keeping.
–. Put.the.plastic.cap.(1).back.on.the.modu-
2
4
1
3
2
KEY
1. Plastic.tap
2. Minimum.pressure.adjusting.nut
3. Maximum.pressure.adjusting.nut
3
.
. again. to. quit. the. fun-
4
ATTENTION
Before  removing  or  refitting  the 
front panel of the boiler, open the 
small upper plastic door.
lator. and. seal. with. a. drop. of. coloured.
sealant.if.necessary.
4.3 
DISMANTLING THE CASING 
   
(fig. 21)
The. casing. may. be. removed. completely. to.
facilitate. boiler. maintenance,. as. shown. in.
fig..
21..
Turn. the. panel. control.
forward.
access. to. the. internal. components. of. the.
boiler..
Fig..20
for.
Fig..21
Tabla de contenido
loading

Este manual también es adecuado para:

Murelle 30 of erp

Tabla de contenido