11 Insert the screws and the nuts for
fixing the uprights superstructure
support and position it in the centre of
the same.
Screw the adjustment nut (A)
12 Rest the superstructure on the two
central uprights. Screw the screws on
the lateral sides without fixing them.
13 Insert the washer (B).
Prepare the uprights on the
superstructure.
B
14 Position the aluminium vault for the
passage of the light cable.
15 Fix the crystal sides and adjust the
superstructure by acting on the
adjustment nuts (B).
16 Insert the crystal shelf.
05060088 02 23/07/2012
A
B
Dallas 3
English
43