Handling And Storage - Diamond SOFTY Manual De Instrucciones

Tabla de contenido

HANDLING AND STORAGE

EN
All the operations described in chapter may be carried out exclusively by technicians who
are also specialized in the lifting and handling of packed or unpacked machines.
They must organize all the operational sequences and use suitable equipment, according
to the characteristics and weight of the object to be handled and in strict compliance with the
applicable regulations currently in force.
CONVEYANCE AND HANDLING
Make sure that no one is stationed within range of lifting and handling operations.
In difficult conditions, specialized personnel should be appointed to oversee the
movements of the machine.
Manual handling of the machine requires at least two people.
The machine must be moved into an upright position, only after every
bowl has been emptied of product.
Lift the box and carefully convey it, avoiding routes with obstacles. Pay attention
to the overall dimensions and any parts sticking out.
Warning: do not make any additional cuts on the packing container.
The WARRANTY does not cover damage caused to the machine during its
conveyance and handling.
The Purchaser will bear the cost of repairing or replacing damaged parts
STORAGE
Before the machine is placed in storage and whenever the machine is started up
again after a period of storage, it must be thoroughly cleaned and sanitized.
Warning: do not store more than two machines stacked on top of one
another.
If the machine is to remain unused for a long period of time, due precautions
must be taken with respect to the place and duration of storage:
• store the machine in a closed place;
• protect the machine from shocks and stresses;
• protect the machine from humidity and large temperature fl uctuations;
• prevent the machine from coming into contact with corrosive substances.
Tabla de contenido
loading

Este manual también es adecuado para:

Nami

Tabla de contenido