Start-Up Procedure; Final Checks - Hoshizaki FM-120KE-HC Manual De Instalación

Ocultar thumbs Ver también para FM-120KE-HC:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 28
ENGLISH
Inlet Hose
Outlet Hose

8. START-UP PROCEDURE

1) Check that the power supply cord is disconnected.
2) Move the operation switch on the operation panel to the "ON" position.
3) Open the water supply tap.
4) Connect the power supply and energise.
5) The display will illuminate in the "ICE" mode.
6) The following should occur in sequence:
a) Water reservoir will fill.
b) Gear motor will start.
c) Compressor will start.
Check the conditions and quality of the ice production.
Do not use ice produced in the trial run. It might be contaminated with foreign matter in the water circuit. Discard or flush down
the drain.
Clean the storage bin before use (see "III. 1. CLEANING" in instruction manual).

9. FINAL CHECKS

1) Check for correct supply voltage.
2) Check that the icemaker is properly earthed.
3) Check that the icemaker is free from vibration.
4) Check that all the panels are fixed and secure.
5) Check for proper operation according to "8. START-UP PROCEDURE".
6) Check the water supply and drain connections for water leaks.
7) Instruct the user on correct machine use. Hand the instruction manual to the user.
Water Supply
Inlet G3/4
Drain Outlet
R3/4
HYGIENE
6
Water Supply Tap
Inlet Hose
Operation Panel
Ice Button
Display
Stop Button
Maintenance Button
(service use only)
Operation Switch
Tabla de contenido
loading

Tabla de contenido