Start-Up Procedure - Hoshizaki FM-150AKE-HC-SB Manual De Instalación

Ocultar thumbs Ver también para FM-150AKE-HC-SB:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 31
ENGLISH
* The connections to the mains water supply must be made in accordance with the countries' current requirements of the Water
Supply or Water Fittings Regulations.
* Icemaking water must be potable water. Where scaling can be caused by water quality, installation of an external filter or
softener is recommended. Contact your local water treatment professional or Hoshizaki service agent.
* Water supply pressure should be minimum 0.05 MPa (0.5 bar) and maximum 0.8 MPa (8 bar). If the pressure exceeds 0.8 MPa (8
bar), use a proper pressure reducing valve. Do NOT throttle back the supply tap.
* A plumbing permit and services of a licensed plumber may be required in some areas.
* The icemaker drain is gravity flow, so ensure drain hose has an adequate pitch or fall.
* Drain lines should not be installed directly to the sewer system. A vertical air gap of a minimum of 5
cm should be between the end of the drain hoses from the icemaker and storage bin and the floor
drain.
* Be sure to use the new hose-sets supplied with the appliance. Do not reuse any old hose-sets.
1) Attach the angled end of flexible inlet hose (accessory) to the G3/4 fitting on the rear of the icemaker as indicated, ensuring
rubber sealing washer is correctly positioned. Hand tighten sufficiently to provide leak free joint.
2) Attach the other end of inlet hose to the water tap, noting washer is correctly positioned before hand tightening as above. It is
a wise precaution to have a stop valve within easy reach.
3) Hand tighten grey flexible outlet hose (accessory) onto the R3/4 fitting on the rear of the icemaker as indicated, ensuring
rubber washer is correctly positioned to obtain a leak free joint. The hose can be cut to length as necessary to suit position of
main drain.
Inlet Hose
Outlet Hose

8. START-UP PROCEDURE

1) Check that the power supply cord is disconnected.
2) Move the operation switch on the operation panel to the "ON"
position.
3) Open the water supply tap.
4) Connect the power supply and energise.
5) The display will illuminate in the "ICE" mode.
6) The following should occur in sequence:
a) Water reservoir will fill.
b) Gear motor will start.
c) Compressor will start.
Water Supply Inlet G3/4
Drain Outlet R3/4
Ice Button
Display
Maintenance Button
(service use only)
6
5cm air gap
Floor
Drain
Water Supply Tap
Inlet Hose
Operation Panel
Stop Button
Operation Switch
Tabla de contenido
loading

Tabla de contenido