Kohler Sterling 40202 Guia De Instalacion página 6

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Fill
Compression
Valve Nut
Washer
Supply
Shank
Seal
Compression
Washer
Nut
Ferrule
Coupling
Nut
Supply
Shut-Off
Valve
Supply Shut-Off Valve
Connection
4. Final Connections
Connect the supply shut-off valve to the toilet supply shank.
Open the supply shut-off valve slowly to check for leaks. If the
connections have been properly assembled, a slight tightening of
the nuts should stop leakage.
Install the toilet seat according to the packed instructions.
Carefully set the cover on the tank.
Flush the toilet several times using first one push button and then
the other, and check all connections for leaks. Verify proper
operation.
Periodically check for leaks for several days following the
installation.
Adjustments
Adjust the water level in the tank to the marked waterline.
Rotate the threaded rod clockwise to raise the water level or
counterclockwise to lower the water level as needed.
Periodically check for leaks for several days following the
installation.
1035429-2-D
Tubing
Adjusting the Water Level
6
Waterline
Sterling
Tabla de contenido
loading

Este manual también es adecuado para:

Sterling 402025Sterling 402027Sterling 402028

Tabla de contenido